The industry is all abuzz about ADA

“The industry is all abuzz about ADA – as well it should be – and according to the letter that was sent out by the ATMIA – it looks like there will be no flexibility or extensions…. so if you are not already in the upgrade game -  time to start the upgrade path is now – we have the machines ready – are you ready? – don’t get Stung”

When I think about the ADA upgrade path I am reminded about the story about the guy that jumped from the 10th floor…and as he passed the 3rd floor he was heard yelling “so far so good”…..

The “B”

Advertisement

Leave a Comment

Filed under ATM

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s